Skip to main content
  • 1,200 delegates
  • 2 storey set
  • 1 day build
  • 120 volunteers

All Staff Conference

The Brighton Centre

For The Hyde Group, we created an ambitious two-storey moving stage set that really felt like home.

With an exterior that looked like terraced houses and a cosy home interior that was revealed piece by piece, this set was inspired by Hyde’s real-life housing solutions. Supported by two massive 5m LED screens, speakers made use of every space – addressing the audience from the upstairs bedroom, playing a game of Family Fortunes in the front garden and holding panel discussions around a welcoming kitchen table.

1,200 delegates were wowed by the presentations and enjoyed interactive market stall food and an evening drinks reception. The goal was to leave delegates feeling inspired, motivated and valued for the important work they do. We achieved this through theatrical staging, interactive formats and rich, emotive content.